1, The bonding team leader in accordance with the production plan, to be bonded pieces ready to work.
2.The gluer turns the machine on before the production, checks the temperature, time, speed and pressure data of the cloth, and checks whether all parts of the machine are in normal operation.
3. pre-heating until the green light indicates that the green light has reached the standard. At this point, the fabric and the fabric of the fabric and the temperature test paper will be bonded together with the machine to check whether the temperature test paper is consistent, after being cooled to test whether the adhesive force meets the requirements of bonding firmly, with or without glue penetration, and then cut pieces of formal bonding operation. Record the test results and samples, and keep them in good condition.